(865) 675-1550

LeConte Center at Pigeon Forge

Project Type: Commercial

The Wakefield Corporation was awarded the project and began work August 2012. The project required 916 pre-engineered metal trusses, 2,926 metal joist rafters, 65,452 sqft of Armstrong drywall grid & 10,000 lineal feet of metal stud framed walls.